A geotechnical borehole rarely stays in one material. It starts in soil, where the SPT gives the N-value, and often ends in weathered rock or rock, where the SPT reaches refusal and the project needs core. A mixed (multifunction) rig does both with the same machine: an SPT system for the soil and a rotary system for the rock, in the same hole.
The problem with two rigs
When SPT and rotary drilling need separate machines, a typical sequence looks like this: the SPT rig drills until refusal, leaves, a rotary rig is mobilised, finds the hole, and continues. Each mobilisation costs transport, waiting time and a day of schedule. The hole can also be disturbed in the handover.
What a mixed rig is
A mixed rig combines two systems on one chassis:
Automatic drop-hammer SPT for the soil: the rig drives the sampler and the hammer drop is repeated by the machine, with one operator and one assistant.
Rotary system for the rock: the same rig rotates the core barrel to recover rock core, with capacity depending on the diameter.
Diamond Drill builds this concept in the CD 100, CD 200 and CD 400 rigs. All three have a 90° drilling angle, self-propelled rubber tracks and hydraulic levelling.
Three ways to cover soil and rock
| Two separate rigs | One mixed rig | Rotary-only rig | |
|---|---|---|---|
| SPT in soil | Yes (SPT rig) | Yes, automatic hammer | Not designed for it |
| Core in rock | Yes (rotary rig) | Yes, rotary system | Yes |
| Mobilisations per hole | Two or more | One | One |
| Crew | Two crews | One operator and one assistant (SPT) | Crew sized to the rig |
| Typical use | Large projects with both rigs busy | Soil-to-rock investigations, mixed workloads | Deep, rock-only coring |
When a mixed rig makes sense
Sites where the rock appears at an unknown depth and the project needs both the SPT profile and rock core.
Companies that want to take SPT and coring contracts without buying two machines.
Jobs with restricted access, where bringing two rigs is hard or impossible.
Schedules where one mobilisation per hole makes the difference.
What you give up
A mixed rig is a compromise by design. If most of your work is deep rock coring, a dedicated rotary rig will usually reach more depth in the larger diameters. If your work is only soil, an SPT rig without a rotary system may be enough. Be honest about the share of each type of work in your last two years.
Capacity of the CD range
The manufacturer data lists these recommended and maximum values, which always depend on ground conditions, tooling and correct operation:
| CD 100 | CD 200 | CD 400 | |
|---|---|---|---|
| Auto Drop Hammer SPT | 40 to 50 m | 50 to 55 m | 60 to 65 m |
| Rotary, A diameter | 100 to 150 m | 200 to 250 m | 300 to 350 m |
| Rotary, B diameter | 80 to 90 m | 150 to 200 m | 250 to 300 m |
| Rotary, N diameter | 60 to 70 m | 100 to 150 m | 200 to 250 m |
| Rotary, H diameter | 40 to 60 m | 80 to 100 m | 150 to 200 m |
What to check before buying
Whether the SPT hammer mass and drop height can follow your standard (ASTM D1586, ISO 22476-3 or the national one).
The rotary torque and speed for the diameters you use, not just the maximum depth.
How easily the crew switches between SPT and coring in the same hole.
Tool handling: hydraulic winch, vise and tool extractor to pull rods safely.
Transport: the CD range can travel on trailers, vans or small trucks.
Warranty and technical support in your country.
For background, read what is the SPT, automated SPT and RQD in rock core. To compare rigs, see how to choose a geotechnical SPT rig.
Want to cover soil and rock with one rig? Explore the Diamond Drill multifunction rigs or ask for a quote for your project.
Frequently asked questions
What is a mixed SPT and rotary drill rig?
A mixed rig combines an SPT system and a rotary system on the same machine. The crew drills and tests the soil with the SPT, and switches to rotary coring when the SPT reaches refusal, without changing rigs.
Why use one rig for both soil and rock?
One rig means one mobilisation per hole, a smaller crew and a continuous hole through the soil-to-rock transition, which usually shortens the schedule and lowers operating costs.
Can a mixed rig replace a dedicated rotary rig?
For many soil-to-rock investigations, yes. For deep, rock-only coring in large diameters, a dedicated rotary rig usually reaches more depth.
What happens when the SPT reaches refusal?
The refusal criterion is set by the standard or the project. When it is reached, a mixed rig changes from the SPT system to rotary coring in the same hole.
Which Diamond Drill rigs are mixed?
The CD 100, CD 200 and CD 400. Each combines an automatic drop-hammer SPT with a rotary system, with capacities that grow from the CD 100 to the CD 400.
Need equipment for SPT?
Diamond Drill manufactures drilling rigs. Talk to our technical team and find the right solution for your work.

