The groundwater level is one of the most important items in a boring report. It affects foundation design, dewatering and the interpretation of tests. Measuring it badly leads to wrong decisions.
Why the water level is so sensitive
- It controls effective stress in the soil and bearing capacity.
- It defines the need for dewatering in excavations.
- In environmental studies, it shows the contaminant pathway and where to place wells.
When to measure
- During drilling: when you notice moisture, a color change or loss of resistance, stop and record the depth where water was found.
- At the end of the borehole, after a pause: leave the hole at rest for a period and measure again.
- After stabilization: when time allows, measure again several hours later and note the interval.
Check the applicable standard for the times and records required by the SPT test.
How to measure
- Use a water level meter with an audible or light signal, or a tape with a wetted end.
- Reference the reading to the top of the casing or to ground level, and write down which one you used.
- Record date, time and borehole depth at the time of reading.
Errors that distort the reading
- Drilling water: in wash boring, it masks the real water level. Note that the reading is apparent and repeat it after emptying and letting it stabilize.
- Too little waiting time in clayey soils, where water rises slowly.
- Perched water: water held on a clay layer above the main water table.
- Cased or blocked borehole that stops water from entering.
- Seasonal variation: the level measured on one day may differ from another time of year.
What to write on the log
Depth, date and time, the measurement reference, whether the hole was cased and notes on the kind of reading (apparent or stabilized). Also read how to read an SPT boring log and monitoring well construction.
For environmental investigation, see Diamond Drill environmental rigs.
{{t.k50}}
Diamond Drill manufactures drilling rigs. Talk to our technical team and find the right solution for your work.
